Welding as per ASME Sec IX using qualified welders & in accordance with client specification.
Rolling and fabrication of spools in accordance with Isometric, Test Pack provided.
Hydro test, all other Non Destructive & Destructive Test.
Pickling & Passivation of Weld Joints (for SS, Duplex materials).
Complete QA/QC Documentation.
Complete Fabrication includes marking, cutting, rolling and welding as per the required codes / standards.
Notifying the client step by step activities, using standard scheduling procedures.
Qualified Internal Auditor for quality assurance.
Qualified NDT level II and certified welding Inspector for quality control.
Experienced expeditors for coordinating and updating all the activities during each stage.
Arranging TPI if required from the starting stage of the fabrication till the end preparation of Pipe spools.